Full Bathroom Installation in Barking

Full bathroom installation in Barking, Becontree and Upney. Strip out, first fix, tiling, second fix and finish: one team, fixed written quote, no subcontractor roulette.

Thinking about your Full Bathroom Installation?

Send a photo or a quick video of the room on WhatsApp. Or ask for a free fixed quote with no obligation. We will tell you straight what it needs.

A bathroom is five trades in a room the size of a hallway, and almost everything that goes wrong with one goes wrong because they turned up in the wrong order. In the Becontree houses the room is small and the pipework is old, which makes the sequencing matter more, not less.

Many Becontree houses were built with the toilet in its own small room next to the bathroom, and joining the two is one of the most asked-for jobs in Barking. Taking the wall out turns two cramped rooms into one that can take a proper shower, but it puts the soil pipe at the top of the list, so the drainage is checked before any design is agreed.

What's involved

Full Bathroom Installation in Barking, done properly

01

One team, in the right order

Strip out, first fix, board and tank, tile, second fix. Booked as one job so nobody is waiting on anybody.

02

Old pipework dealt with honestly

A lot of Barking bathrooms still have pipework nobody should be building on top of. We tell you what needs replacing before we cover it up.

03

A fixed, written quote

What it costs, what is included and how long it takes, before you commit. Bathrooms are where surprise charges live and they should not be.

04

Everything taken away

Old suite, tiles, rubble and the skip run are in the price.

05

Separate WC knocked through

The wall between an old toilet and bathroom taken out and the floor made good, so the room is planned as one space rather than two.

06

Soil stack route checked

Where the toilet can go depends on the soil pipe. It is located and checked before the layout is fixed.

Good to know

Full Bathroom Installation: your questions

How long does a bathroom take?

A straight replacement in a Becontree house is about a week to ten days. Moving the layout, or a room that needs the floor or pipework sorting first, takes longer - and we give you a day-by-day plan rather than a vague fortnight.

Can we use the bathroom while you work?

Not for most of it, and anyone saying otherwise is not being straight with you. We tell you exactly which days you will be without it so you can plan.

Do you supply the suite or do we?

Either. Plenty of people buy their own and have us fit it, which is fine - just show us the plan before you order, because the commonest problem is a unit that cannot physically go where the drawing puts it.

Can you knock the toilet and bathroom into one room?

Usually, yes, and in a Becontree house it is often the best change you can make. The dividing wall is normally a light partition, but it is checked first, and the new layout is planned around where the soil pipe runs.

What is included in a full bathroom fit?

Stripping out the old suite and tiles, pipework, boarding and tanking, tiling, fitting the new suite and taking all the waste away, with any electrical changes done by a qualified electrician. Anything beyond that, such as moving a soil stack, is spelled out in the quote.

More from Barking Bathrooms

Other bathroom services

Wet Rooms

Learn more →

En-Suites & Cloakrooms

Learn more →

Shower Rooms

Learn more →

Disabled Bathroom Adaptations

Learn more →

Bath to Shower Conversion

Learn more →

Small Bathroom Layouts

Learn more →

Small Bathroom Renovation

Learn more →

Bath to Shower Conversion

Learn more →

Shower Room Installation

Learn more →
WhatsApp us